Checked in at Wildbranch this afternoon. Someone is logging on the road and it was noisy!! Never heard much noise before so hope this isn't gonna be a regular thing. It was a joy to see that most of the siding was up on the house and it looks like all the dry wall mudding is done. Also, the vinyl flooring was laid in the downstairs area. Next week the AC gets installed and concrete will be poured for the patio and for the area where there is a hot tub going in. Week after that the trim/finish guy will be in to install the molding, cabinets, stair case pieces. Now if we could get the water lines run to the house!! A toilet and a working sink would be nice too!
At an age when I am old enough to know better, I moved beyond the raised beds of my suburban garden. In October of 2010 I acquired 15 acres of undeveloped land in Southern Indiana. Join me on this journey as I turn my land into a place of rest, retreat and refuge--a place to grow new things--a place called Wildbranch.
Friday, August 12, 2011
getting there
Checked in at Wildbranch this afternoon. Someone is logging on the road and it was noisy!! Never heard much noise before so hope this isn't gonna be a regular thing. It was a joy to see that most of the siding was up on the house and it looks like all the dry wall mudding is done. Also, the vinyl flooring was laid in the downstairs area. Next week the AC gets installed and concrete will be poured for the patio and for the area where there is a hot tub going in. Week after that the trim/finish guy will be in to install the molding, cabinets, stair case pieces. Now if we could get the water lines run to the house!! A toilet and a working sink would be nice too!
Checked in at Wildbranch this afternoon. Someone is logging on the road and it was noisy!! Never heard much noise before so hope this isn't gonna be a regular thing. It was a joy to see that most of the siding was up on the house and it looks like all the dry wall mudding is done. Also, the vinyl flooring was laid in the downstairs area. Next week the AC gets installed and concrete will be poured for the patio and for the area where there is a hot tub going in. Week after that the trim/finish guy will be in to install the molding, cabinets, stair case pieces. Now if we could get the water lines run to the house!! A toilet and a working sink would be nice too!
Subscribe to:
Post Comments (Atom)
I hope you are planning an Open House for all us lookey-lou's!
ReplyDeleteLooking good, Sharon!!! Love your place. -Sally
ReplyDelete